Standard Specifications
A complete printed book of drawings and specifications can be obtained for a fee of $128.50 plus tax. Please see contact below.
Mr. Phil Ubene, C.E.T.
Drafting Supervisor
Engineering - Development and Geomatics
350 City Hall Square West, 3rd Floor
Windsor, Ontario, N9A 6S1, Canada
519-255-6257 ext. 6160
pubene@citywindsor.ca
Office hours are 8:30 a.m. to 4:30 p.m.
Phone: For general information, call 311. For detailed inquiries, call (519) 255-6257.
Fax: (519) 255-9847
Email: engineeringdept@citywindsor.ca
Document | Title |
---|---|
Index | Index to Standard Specifications (February, 2024) |
S-1 | Sewers (January, 1999) |
S-2 | Maintenance Holes and Catchbasins (March, 2018) |
S-3 | Earth Excavation (Grading) and Structural Removal (January, 1976) |
S-4 | Granular Base & Aggregates (February, 2022) |
S-5 | Concrete Curbs and Gutter Systems (April, 2022) |
S-6 | Concrete Sidewalk and Driveway Approaches (April, 2022) |
S-7 | Concrete Pavement and Concrete Base (April, 2022) |
S-8 | Sewer Pipeline and Culvert Rehabilitation by Cured-In-Place Pipe (February, 2022) |
S-9 | Concrete (February, 2022) |
S-10 | Hot Mix Asphalt (February, 2022) |
S-11 | Culverts, Headwalls and Roadside Drainage (May, 2017) |
S-12 | Borehole Investigations (February, 2024) |
S-13 | Weighing of Materials (July, 2012) |
S-14 | Sodding (February, 2022) |
S-15 | Seeding (February, 2022) |
S-16 | Perforated Corrugated Pipe Sub-Drains (January, 2015) |
S-17 | Reinforcing Steel (May, 2017) |
S-18 | Routing and Sealing (July, 2012) |
S-19 | Cleaning of Gravity Sewers, Manholes and Catchbasins (January, 2015) |
S-20 | Vacant |
S-21 | Vacant |
S-22 | Vacant |
S-23 | Maintenance Painting of Structural Steel (January, 2015) |
S-24 | Unshrinkable Backfill (July, 2012) |
S-25 | Vacant |
S-26 | Vacant |
S-27 | Vacant |
S-28 | Full and Partial Depth Reclamation with Expanded Asphalt Stabilization (July, 2012) |
S-29 | Utility Cuts Restoration (August, 2012) |
S-30 | Bridges (February, 2022) |
S-31 | Keyhole Excavation (July, 2012) |
S-32 | CCTV Sewer Inspection (February, 2022) |
S-33 | Winter Control Snow Plowing, Salting and Snow Removal Activities (January, 2015) |
S-34 | Topsoil (June, 2022) |
S-35 | Replacement of Private Drain Connections (May, 2022) |
S-36 | Preservation of Trees (May, 2017) |
S-37 | Dust Control (July, 2012) |
S-38 | Prevention of Debris from Entering Existing Sewer Systems (July, 2012) |
S-39 | Backfill and Utilities (January, 2015) |
S-40 | Installation Method of Traffic Signage Disturbed by Construction (July, 2012) |
S-41 | Open Graded Drainage Layer (January, 2015) |
S-42 | Cold Milling of Asphalt Pavement (January, 2015) |